Diagnosing and Resolving Casing Lock-Up in an Extended-Reach Lateral
Can a well drilled with an RSS, showing an apparently smooth trajectory and a successful conditioning trip, still experience complete casing lock-up? What might the pre-run assessments have missed?
THE SCENARIO
A 5.5-in. production casing string (23.0 lb/ft, P-110, semi-flush connections) was being run in an extended-reach horizontal well targeting a deep shale/tight carbonate reservoir.
Well geometry:
Production hole: 8.5 in.
TVD: 10,600 ft
Total MD: 22,400 ft
Horizontal lateral: 10,800 ft
During casing deployment, progressive axial drag began at 14,850 ft MD and eventually resulted in complete lock-up at 16,410 ft MD, leaving 5,990 ft of the lateral uncased.
WHY WAS THIS UNEXPECTED?
Pre-run assessments had indicated favorable conditions:
Trajectory: Stationary MWD surveys recorded every 90 ft showed an average DLS of just 1.15°/100 ft, comfortably below the 3.0°/100 ft design limit.
Torque and drag modeling: The pre-run model, based on 90-ft survey data and an open-hole friction factor (OHFF) of 0.24, predicted smooth casing deployment to TD.
Hole conditioning: A conventional slick wiper trip showed normal pick-up and slack-off hook loads.
However, as casing couplings and centralizers entered the mid-lateral, effective friction increased beyond 0.47. Applying additional slack-off weight through the top drive only caused the casing to buckle helically in the build section rather than advance downhole. The operation eventually required a high-risk trip out with casing, potentially exposing the operation to approximately $1.5 million in NPT costs.
ADDITIONAL OPERATIONAL DETAILS
BHA: 8.5-in., 6-blade PDC bit (1.5-in. Short gauge), rotary steerable system (RSS), and a full-gauge string stabilizer positioned 38 ft above the bit.
Drilling parameters: Rotary drilling throughout; surface rotary speed of 140 RPM; instantaneous ROP spikes up to 255 ft/hr.
Mud: 12.5 ppg OBM; PV 29 cP; YP 18 lbf/100 ft²; LGS 6.9%.
Survey acquisition: Stationary MWD surveys every 90 ft, requiring 7–9 minutes of pumps-off time per stand.
Casing running arrangement: Conventional fill-up/circulating tool, no casing rotation, and rigid bow-spring centralizers (one per two joints).
THE CHALLENGE FOR DRILLING PROFESSIONALS
Despite the use of RSS, apparently favorable trajectory measurements, and a successful conditioning trip, what could have caused such a dramatic increase in casing-running friction?
MOST IMPORTANTLY, WHAT WOULD YOU HAVE DONE DIFFERENTLY?
What changes in drilling practices, pre-run assessments, engineering calculations, hole-conditioning procedures, or technology solutions could have helped prevent this situation?
Once progressive drag was observed, what immediate corrective measures would you recommend to regain casing movement and avoid complete lock-up?